We were contracted by our client to deliver approximately 110t of structural steelwork to support various AHU installed by the client. All 110t of galvanized steelwork was installed during a three week maintenance shutdown.
We were contracted by the client to delivery approximately 30t of structural steelwork. Our package included the steel frame, intumescent coating, metsec cladding rails and comflor decking.
We were contracted to install 35t of structural steelwork and associated 150mm comflor decking for a client of ours who undertook principle contractor on a government funded research and development programme in Cambridge, England.
We were contracted by the client to design, supply and install approximately 25t of structural steelwork for the new Pentyrch Medical Centre located on Llantrisant Road.
We were contracted by the client to deliver a 30t steel frame complete with metsec and roof comflor decking. The installation required cooperation with the blast proof concrete wall contractor for shuttering and pouring access.
We were contracted on this project in two stages, first required the Dr Who building to be dismantled at it's location on Cardiff Bay Dock. The second phase required the erection of both the internal mezzanine floor (25t) and the…